C51E engine room line

SA underbody line

This line has large cycle transport mode of roller bed GEO pallet. The whole line could achieve synchronous transmission, single station cycle time is 68s, GEO pallet has windmill switchover structure that could achieve switchover of 4-6 vehicle types, the underbody line includes 47 stations in total.
M20 floor line

This line has synchronous shuttle conveyor, 9 stations with 4 robots for re-welding. In this line, the floor assembly is transported to main line by AFM.
GM308 floor line and mainline

There are 9 stations in total with synchronous lifting electric shuttle.
C51E floor re-welding line

This line has a total of 9 stations and 15 robots. This line includes function of windmill structure switchover, gluing, automatic handling, robot welding etc.


First-class service
We provide first-class service for you whenever and wherever possible.
Perfect accessory supplying chain
Yantai Wooshin has the best accessory supplying chain and the reserves of frequently used accessories could meet the market's demand.
Large scale service team
Yantai Wooshin has large scale service team and Wooshin can provide maintenance, accessory, technology and other service whenever and wherever possible.